HI,
We have encountered a problem. Our Database is Oracle and Online+redolog backup has been scheduled daily. Jobs starts at 00.05 AM from Indian time and completed at 09.00AM. But two days ago the job has not started and we are getting red in DB13, when i click to see the log, i am getting only a message Scheduling Failed, and there is not any log to find why Scheduling failed. Its already scheduled from a long time and it was running properly, and today again the same message we are getting. What i feel that there must be some resource un avaliablity that's why the scheduling is failed. But how to find out the cause.
I have verified all the dev_w* files there is no information, Can anyone help me to find out the cause of this problem. We are on ECC 6.0 and Oracle 10.2.0.2.0
Regards,
Subhash