Hello,
As we have to upgrade his SAP ECC from Oracle 10.2.0.2 to Oracle 11g in his productive system, a customer has built a strategy as if it was an SAP upgrade (locking of users/jobs/printings/.. AND test of all their functionalities after the upgrade before unlocking every thing).
It's the first time I'm asked to follow such a strategy for un Oracle Upgrade, and for me, it is not necessary at all.
Could someone give me a link where SAP could mention whatever about this topic ?
Thanks a lot!
Best regards,
Gérard