Dear Experts,
For SAP NW 730 upgrade to NW 731, I am working in planning phase.
Here I need to gather the requirement from Oracle DB perspective which is running on 11.2. SBP version too will be provided if required.
I have already gone through the upgrade Master guide and Stack specific SUM tool guide.
Also i have covered the note 1805195 - Handling and troubleshooting of tablespaces during Upgrades, EhPs and SPs updates, which SAP says is release independent.
I am highly doubtful with the TS name changes after upgrade, as per the note mentioned above. As, i have never seen any TS with name PSAP<SID>X. Also it speaks in length about the issues encountered during that stage due to inconsistencies with TBTCO tables.
Since as per the upgrade guide, these issues will be encountered at DB cloning stage only, I would request have the right information handy with me to avoid any delay at the time of upgrade.
Please provide your understanding on how DB cloning can be optimized and how to avoid known issues with TS modification in downtime.
Thanks
Abhijeet