Hi experts,
After the SP Upgrade, when doing the import of the VBAP table by transport, it failed.
Table has been renamed to QCMVBAP during a table adjustment, however the conversion has failed.
The error messages show that it was not possible to
complete the conversion related to specific indexes which could not be
removed. We dropped the constraint and then the index.
Now a job is running the table conversion, but it takes very long time ( more than 27 hours already ).
Is there any way to speed up the conversion in Oracle ?
Please advise,
Cheers!